The Old Gotthard Tunnel Route - Driver's Eye View
The Old Gotthard Tunnel Route - Driver's Eye View

Storyline

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
    Released
    10/1/2018
    Runtime
    1h 52min
    Genre
    Status
    Released
    Language
    English
    Production
    Video 125

Data provided by 

This project uses the TMDB API but is not endorsed or certified by TMDB.
Version : 1.1.0

Admin

Language: