Stars Over the River Drin
Stars Over the River Drin

Storyline

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Cast

Data provided by 

This project uses the TMDB API but is not endorsed or certified by TMDB.
Version : 1.1.0

Admin

Language: